DIFFERENTIATORS

Why
Patok?

We are not an ERP. We are not a SCADA. We are not a traditional MES. We are the fastest way to give your plant operational memory — with no seven-figure investment, no expensive hardware, and no months of implementation.

See the Platform
Patok industrial kiosk with scanner and thermal printer at a workstation

What makes us different

Patok was designed from scratch for plants that do not have SCADA, do not want a monstrous ERP, and need results this week — not in six months.

🚫

No SCADA, no IoT

You do not need sensors, PLCs, or industrial networks. Patok runs on QR + tablet. The operator is the sensor — more reliable and cheaper.

⏱️

Implementation in hours

White Belt in 72 hours. Not months, not years. A Gemba consultant configures, trains, and leaves your plant producing data from day one.

💰

A fraction of the cost

No SAP/Oracle license, no on-premise servers, no dedicated IT team. A monthly subscription that includes support, updates, and consulting.

Results that matter, from day one

We do not promise magic. We promise real data, captured by your operators, visible in real time.

Operator scanning a QR code with a phone on the production line
NO EXPENSIVE HARDWARE

QR + Tablet. Nothing else.

While others require $500 IoT sensors per machine, programmed PLCs, and industrial networks, Patok runs on $0.05 QR stickers and an Android tablet. The operator scans, the data is captured.

  • QR stickers on every machine and workstation
  • A $100–200 Android tablet as the kiosk
  • No wiring, no industrial network infrastructure
FAST IMPLEMENTATION

72 hours to full visibility

With White Belt you can have your first machine sending data in 72 hours. You do not need a six-month project. The Gemba consultant arrives, configures the workstations, trains the operators, and your plant starts generating operational memory.

  • White Belt: 72 hours → first machine visible
  • Green Belt: 2 weeks → the full line
  • Black Belt: 4–6 weeks → a professionalized plant
Complete Mieruka station with QR poster, tablet, and scanner gun

Patok vs the traditional alternative

CriteriaTraditional ERP / MESSCADA / IoTPatok
Implementation time6–18 months3–6 months72 hours → 4 weeks
Upfront investment$50,000-500,000+$10,000-100,000+Monthly subscription
Hardware requiredServers + licensesSensors + PLCs + networkTablet + QR stickers
Operating complexityDedicated IT teamSCADA engineerOperator with a tablet
Part-by-part traceabilityWith extra modules $$Not applicableIncluded by default
Automatic OEEManual or with a module $$With extra programmingAutomatic from day 1
Remote visibilityWith VPN + configurationWith a historian + VPNFrom any browser
ScalabilityWith a project and $$$More sensors + wiringAdd QRs and tablets

No SCADA. No IoT.
No excuses.

Find out how your plant can have full visibility in less time than an ERP quote takes.

See Pricing